Method Statement Services in the UAE

Method Statement Preparation for UAE Contractors

A method statement is not optional on most UAE projects – it is a contractual and regulatory requirement that must be submitted and approved before construction activities begin. Buildesk prepares method statements that meet the required format, include the correct technical content, and pass first-time review.

What a Method Statement Covers

  • The scope of the specific construction activity
  • The sequence of operations, step by step
  • Plant, equipment, and materials to be used
  • Labour resources and responsibilities
  • Quality control measures and inspection hold points
  • Health, safety, and environmental controls
  • Reference to relevant drawings, specifications, and standards

Activities We Prepare Method Statements For

  • Excavation and earthworks
  • Piling and foundation construction
  • Concrete works – formwork, reinforcement, and casting
  • Structural steelwork
  • Blockwork and masonry
  • MEP installation – electrical, plumbing, HVAC
  • Waterproofing and external works
  • Fit-out and finishing works
  • Demolition and temporary works

Formatted for Dubai Municipality, DEWA, and Main Contractor Requirements

Different authorities and clients have different format requirements. Dubai Municipality, DEWA, RTA, and large main contractors each have their own template expectations and technical standards. We have prepared method statements accepted by all of these bodies and format every document to the specific requirement of your project – not a generic template that gets rejected on first submission.

How to Get Started

Send us the project details and activity scope and we will provide a fee and timeline within 24 hours. Most single-activity method statements are delivered within 3-5 working days. Contact our technical team.